Your cart is currently empty
To Include: “Installation of New Chairlift at Big Rock, Mars Hills, Maine”
Sealed bids for Ski Area Improvements at Big Rock will be received by the Big Rock Mountain Manager at the Main Lodge Building, 37 Graves Road, Mars Hill, Maine, on Wednesday, May 22, 2024 at 9:00 a.m. local time, at which time and place all bids will be publicly opened and read aloud. Bids submitted after this time will not be accepted. Bids must be submitted in a sealed envelope clearly marked "Installation of New Chairlift at Big Rock, Mars Hills, Maine”. Alternatively, emailed bids shall be accepted and should be sent to: [email protected]
The proposed work may include, but is not necessarily limited to: Installation of chairlift system to include erection of owner furnished chairlift structures and equipment, concrete foundation forming, reinforcement, pouring and finishing, construction engineering, electrical wiring, controls testing and equipment commissioning, as well as other ancillary items. Big Rock, under a separate RFP and contract, will provide installation of top & bottom terminal operator buildings, final grading and fill activities around terminal stations and intermediate towers, electrical power requirements to the operator buildings and other site improvements.
Drawings, Specifications, and Contract Documents may be examined at:
Big Rock, Main Lodge Building, 37 Graves Road, Mars Hill, Maine 04758;
All Requests for Information (RFI’s) must be submitted no later than May 15, 2024 at 5:00 p.m., to the Engineer
Copies of the above documents may be obtained from the office of Aviest Engineering., by e-mailing Aviest at [email protected] for an electronic copy or a hardcopy. Hard copies require a non-refundable fee of Eight Hundred Dollars ($800.00) per set, including postage and handling. Hardcopies will be mailed upon receipt of payment. ALL CHECKS SHALL BE MADE PAYABLE TO THE “AVIEST ENGINEERING”, and forwarded to Aviest Engineering, at 120 Rabbit Ridge Rd Woodland, ME 04736. Partial sets, separate drawings or individual sections of the documents will not be distributed.
Bid security in the amount of at least five percent (5%) of the total bid must be submitted with the Bid. The bid security may be either a certified check or a proposal guarantee bond executed by a surety company authorized to do business in the State of Maine. Bid security shall be made payable to the Big Rock. Late bids, unsigned bids, facsimile bids, or bids submitted without security will not be considered.
The successful bidder must furnish a 100 percent Performance Bond, and a 100 percent Labor and Materials Payment Bond, and begin execution of this contract within five (5) calendar days following the Notice to Proceed.
Construction under this contract will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program.
Wages paid to employees must comply with the minimum established by U.S. Department of labor Wage Determination and CH 149, § 26-27D, M.G.L. The contractor must comply with the Davis-Bacon Act, Anti- Kickback Act, the Occupational Safety and Health Act, the Contract Work Hours and Safety Standard Act, Title VI of the Civil Rights Act of 1964 and Executive Order 11246.
Big Rock reserves the right to reject any and all proposals, to waive any technical or legal deficiencies, and to accept any bid that it may deem to be in the best interest of Big Rock.
By:
BIG ROCK
Mr. Travis Kearney, Big Rock General Manager